Monday, 3 December 2012

Monday 3rd December 2012

This morning, the building was splitted into 3 sections:

Mike - Ground floor and south stair
Rebecca - Roof and 2nd floor
Josh - 1st floor and outside object (railing)

Outcome:

Ground floor + South Stair are combined and texturing (Done)
Middle floor - Texturing (Done)
Top floor + Roof - Texturing (in progress)

Problem:

Rebecca had problems with her floor so she swapped role with Mike so he could double check her progress

This wasn't working out so we had a team talk and decided that we should divide the roles properly. 3 people can't work on the building at the same time because that would cause delay and matching the textures.

Mike - Creating more asset for the JL Building
- KeyBoard
- Computer
- Radiator

Rebecca - Fixing the roof (vertex) and texturing

Josh - Merging all 3 floors together for the texturing.